Hawker Modular was approached by the schools surveyor to provide a turnkey solution for a new nursery and pre-school building. The new facility had to accommodate the following:

  • Nursery Room
  • Pre-School Room
  • Children's Toilets
  • Disabled Toilets
  • Office
  • Food Preparation Room

The location was identified by the surveyor and planning permission had been submitted and granted.

Following a site survey Hawker Modular proposed a 7 bay modular building, the layout was agreed and colours confirmed. The site needed the existing levels to be reduced by approx. 1.5m to enable level access to all doors, as the school was built recently the existing service drawings were all available and were in ideal locations.

TESTIMONIAL

The building was handed over on time and on budget ready for the next generation to have fun and learn.